Persian
Fri, April 27, 2018, 12:40
 

Supply of 455 subway units and 160 double decks and 38 electric locomotives
Regarding the contract with Tehran Metro Company in 2007, providing 245 aluminum body wagon units (35 trains) and 210 steel body wagon units (30 trains), 160 double-decks and 38 electric locomotives is the most important project in progress. Manufacturing the body of double decks and assembly of subway wagons is performing in the TWM Factory in such a way that 42% to 52% cost of the wagon equipment are produced inside the country. In this regard, a portion of the third generation trains with steel body and the fourth generation with aluminum body, double-deck wagons and electric locomotives have been delivered to Tehran Metro Co. and are now under operation.
Status : In Progress
Registration Date : 2015/01/19
Update Date : 2015/01/27
2018 Tehran Wagon All rights reserved.